Engineering and Maintenance scorecard templates
Mining
Engineering and Maintenance scorecards for Mining: Engineering Manager, Maintenance Engineer and Maintenance Manager. These are full balanced scorecards rather than blank grids — the KPIs, targets, weightings and rating scale are already in place, ready to adjust to your own period. Free Excel files.
4 Engineering and Maintenance scorecards
Engineering and Maintenance scorecards — FAQs
Which Engineering and Maintenance roles have a scorecard template?
Engineering Manager, Maintenance Engineer, Maintenance Manager, Senior Engineer. Each has its own scorecard with KPIs written for that specific role.
Can I use a Engineering and Maintenance scorecard for a different industry?
Yes. These are written for Mining, but the structure and most measures transfer to other industries — the KPI rows, targets and weightings are all editable.
How does the scoring work?
Rating % = (Actual − Base) ÷ (Stretch − Base) × 100, where Base = 0% and Stretch = 100%. Ratings are weighted by each KPI's Weight % and summed into an overall score. Only the yellow Actual cells need filling in — everything else calculates.
Can the templates be edited?
Yes. The KPIs, goals, targets and weightings are all editable, with dropdowns on direction, reporting frequency and target period, and cell comments explaining each column.